| Tuesday 02/02/99 ~ More Pictures |
Craig finally brought in some more pictures, I'll post them today.
I dropped a whole bunch of pictures on the site of the intersection installation and bench work. what allot of work. <g>
| Monday 02/01/99 ~ Tx ~ |
Checked Telemetry Modules to see what the field strength was this morning and they were still -60 dbm. Working great! <g>
Friday 01/29/99 ~ Final ~
Finished the Racon Dish installation today at city hall and performed a loop-back test and everything passed. Meter reading on Joe Butte and at City Hall for the Racon dish was 7.002 for Signal.
Craig went to Joe Butte and installed the EF Johnson Telemetry Modules and performed a test at the shop for Signal Strength and we had a -60 dbm. Tested all cables and Combiner for loss and continuity, all pass.
Last test was a laptop - laptop test at 1200 baud to test full bandwidth of telemetry modules and it was a pass.